Tuesday, August 6, 2013

June 5 and 6 - Things are moving incredibly fast!

The first truss is maneuvered into place.....




And, then the next....



Isaac, cheesy grin in place, stands on the pile of road base...
A boy on a pile of rocks and dirt - heaven...



View from the back of the yard, with trusses going in...


Dan's hanging out of the upstairs window of the original house - we had to remove all the bricks from the back of the house.  We reclaimed them for use later.
Isaac's looking up at what Dan is doing upstairs.
Most of the trusses for the addition are up...
Looking down at the kitchen...
Dave and Isaac in an upstairs bedroom, getting ready to remove the old window...
Trusses (for the first part of the addition) are in...
The base blocks for Dan's workshop and the garage are going in....
view from what will be the workshop.
The side of the original house and the side wall of the garage.  The door will take us into the mudroom.


Larry on the bobcat smoothing out the ground under the garage.
I think Larry has way too much fun popping wheelies in his Bobcat...
Dave's looking at a messy old repair that will have to be fixed....
View from the east side of the old house and addition.
Trusses in, and roof begins.
View from the upstairs window (it will be drywalled over, since the addition roof/attic covers it.

No comments:

Post a Comment