Tuesday, August 6, 2013

June 5 activity - posted on August 5, 2013 - Wow! I've been negligent.....



Oh my!  It is August 6, and I just realized I haven’t written in the blog since June 2!  I have been very negligent!  Much has happened in two months!  I’ll try to catch you up, both with pictures and verbage.  If you’re a Facebook friend, I have made some postings with pictures there.  On June 2, 3, 4, I left you with the basement completed, floor joists done, and subfloor started.
June 5, the ‘stick’ walls are erected on top of the subfloor.
 The picture, above, is looking from the hallway behind the original house into the kitchen/family room.
 Above, Dan and Larry (concrete guy) are standing on the footings for Dan's workshop.  The garage will be in front of that building.
 Isaac, with Grandma Gena after preschool, is working hard...
 Isaac, the one with the cheesy grin, brought his own chain saw to the 'struction' site....
 He's grunting, preparing to lift something heavy....
 Looking at the back wall of the addition - the big hole is for french doors onto the future deck.
 The trusses have arrived!  The big crane lifts them from the truck...
 Now, onto the ground, ready for placement.

 Isaac, watching everything from a safe distance!
 The construction crew leader is directing the placement of the trusses from top the wall...

Friday, June 7, 2013

June 2, 3, and 4 - basement is completed, floor constructed

The basement work continued all day on May 29 - the crew finished up around 8:30 that night!  Long day for them.
On Sunday, June 2, Dan and Larry, the cement guy, had to come in to pour the footings for the two garages.  We had thought those should wait until the main addition walls were up, but the carpenters needed the footings done before they could start! So, even though it was Sunday, and even though Dan was sick from a bad cold, they had to soldier on!  See that smile on Dan's face?  He almost always has a smile on his face - just one reason I love this guy!
Larry is getting those footings dug.

There's the basement,all completed and pretty!

And, there's the famous sump pump - works like a champ!

Now you can see the widened door from the old to the new garage.  We'll put an additional step from the big step to the new basement floor.

The floor joists are in place!

Here, you can see where the 'Bilco' door will be placed for egress from the basement.

Dave is bracing the door opening from the old to the new basement.

Looks so different now down in the basement!


Now, the sub floor goes on....

Meg just wants to make sure everything is done properly....a minute ago, she was curled up on the floor in the sun asleep!

Ready to start on the walls!

Meg is sticking with Dan...


A view from the outside of the ' Bilco' door spot.

The first outside wall is being constructed.

One of the pieces of heavy equipment that makes the carpenters' job easier...

The wall is about ready to go up....


This wall is now in place!

 
 
Now, you see the 'Bilco' door ready to be lifted into place.
 








This is where it's going!

 
 
And, there it is!!
 
 
 

May 28 - Basement work

OK, the walls are up and cured, the gravel base is in place.  We got some rain last night - no problem.  Dan has a sump pump that will take care of the water. 
Cement truck is here - ready to start!

First, we have to form a big step as a transition from the old basement (7 foot ceilings) to the new basement.


Finishing up on the step.

Step is complete....
 
Now, for the grunt work - cement is loaded into wheelbarrows, rolled to the far corner and dumped.


Meg is very interested in it all...

The first wheel barrow or two has been dumped.....lots of basement left to do.
 


And it grows.....

Meanwhile, out front, the floor joist beams have arrived.